Essay

7 min read

Designing for the hour after sunset

Most buildings are judged at noon and lived in at night. Inês Maridor on why we draw every project twice — and what the second drawing changes.

Inês Maridor

Founding Partner

Architecture photography loves a blue sky. Planning committees review drawings under fluorescent tubes. Yet the hours in which we actually use our homes, restaurants and libraries are, for much of the year, dark ones.

The second drawing

For twenty-six years we have drawn every facade twice: once at noon and once at midnight. The midnight drawing is not a rendering — it is a plan of where light comes from, what it touches and what it is allowed to leave in shadow.

A building that only works in daylight is only half finished.

That second drawing changes decisions early on. Window positions move to frame a lamp rather than a view. Materials are chosen for how they hold warm light. Ceilings drop where we want intimacy.

  • Start with the pools of light, then draw the walls around them.

  • Hide the source; show the glow.

  • Leave somewhere dark on purpose.

None of this costs more. It simply asks that the night be part of the brief from the very first meeting.

Keep reading

More notes from the studio.

Night Notes

Four letters a year on light, materials and the buildings on our drawing boards. No noise, ever.

Lisbon

Rua das Janelas Verdes 37
1200-690 Lisboa, Portugal

Rua das Janelas Verdes 37
1200-690 Lisboa, Portugal

Oslo

Tjuvholmen allé 14
0252 Oslo, Norway

Tjuvholmen allé 14
0252 Oslo, Norway

© 2026 Maridor Architects Lda.

Set in Cormorant Garamond & Work Sans

Create a free website with Framer, the website builder loved by startups, designers and agencies.